Information For Contractors and Consultants

Notification of Projects and Solicitation for Service and Procurement List

Contractor Information Form

To be included on the HCRCD email notification of bid invitations and solicitation for services and procurement list, please complete the Contractor Information Form and submit to the laurihcrcd@yahoo.coom. A list of potential sub-contractors may be provided to the selected qualified contractors from this information.  The list is informational ONLY.  It does NOT constitute endorsement or recommendation by the HCRCD or affiliated parties and does NOT guarantee consideration or selection.  This is a courtesy offered by the HCRCD.  If you have a Contractor Information Form on file, please be sure the information is up-to-date as non-deliverable addresses and bounced emails will be removed from the list.

Copyright Humboldt County Resource Conservation District. All Rights Reserved

If you are having trouble accessing or downloading any of the documents or forms listed, please contact website support

 

For additional information, please visit

Links and Documents

Salt River Ecosystem Restoration Project Page

 

Salt River Ecosystem Restoration Project - Upper Phase 2A

 

Bids for the Salt River Upper Phase 2A Project were publically opened Wednesday April 26th at 3pm.

 

 

 

 

 

 

 

 

 

 

A conditional or qualified bid will not be accepted if it modifies the Plans or Specifications or method of work. A mandatory pre-bid meeting is scheduled for WEDNESDAY APRIL 12, 2017 at 1PM at 1005 Port Kenyon Road (between California Street and Rasmussen Lane) Ferndale, CA 95536. See map in Information for Bidders. A bidder who fails to attend the entire mandatory pre-bid meeting or fails to sign the sign-in sheet shall be disqualified from bidding.

The work consists of the furnishing of all labor, equipment, and supervision for restoration of Upper Phase 2A of the Salt River Ecosystem Restoration Project. The work generally includes vegetation clearing, grubbing, excavation, sediment hauling, channel rock installation, placement of large wood habitat structures, bridge, culverts and diversion structure installation, and seed/mulch application.

 

Bids will be received at the office of GHD Inc., 718 Third Street, Eureka, California until 3PM, Pacific Daylight Time WEDNESDAY APRIL 26, 2017.

The Contract Documents are available online, click links below: (large pdf files)

CONSTRUCTION DRAWINGS-Plans

CONSTRUCTION DOCUMENTS-Specifications

April 12 Mandatory Pre Bid Meeting Sign In Sheet

Addendum #1

Addendum #2

Addendum #3

Addendum #4

 

Construction of Phase Upper 2A of the Salt River

Ecosystem Restoration Project

 Set to Begin in 2017!

 

The Salt River Ecosystem Restoration Project is beginning Phase Upper 2A of restoration to the Salt River channel and Francis Creek.  Construction activities will occur along Port Kenyon Road, Dillon Road, Goble Lane, Bertlesen Lane and Fulmor Road from June through October 2017. Activities will include building construction entrances, excavation of the channel sediment, and off hauling of channel materials.

The Humboldt County Resource Conservation District has contracted with Figas Construction to do this work. We appreciate your cooperation and thank you in advance for helping your community with efforts to restore the Salt River and decrease the annual flooding that impacts many people in the community. Please feel free to contact the HCRCD with questions regarding project.

Contractor

Total Bid

Figas Construction

 $                                 3,258,235.00

McCullough Construction

 $                                 3,428,986.94

Hanford ARC

 $                                 4,714,980.00

Mercer-Fraser

 $                                 4,768,200.00